Please consult your local landfill, transfer station, recycling facility, or local municipality before ordering a bin to ensure you have the appropriate documentation for restricted items. Please note we will not haul away restricted items without proper documentation, however we will try to work with you to arrive at a solution.
Drywall Disposal
Customers disposing of drywall are required to submit a Drywall/Asbestos Waste Declaration and Acknowledgement form. By signing the form, the customer agrees to accept the full liability for all clean-up costs associated with dumping undisclosed asbestos containing material.
Drywall will only be accepted if one of these conditions is met:
- Clean cuts of drywall without tape, texture coating, mud, or joint compound.
- The drywall is date stamped 1990 or newer (not every piece in a load needs to be date stamped, but at least one piece must be and the load must appear consistent or additional date stamps and/or asbestos testing will be required). Please ensure the date stamp is clearly visible to the landfill operator upon entry.
- Laboratory test results or a hazardous materials assessment report from a Qualified Person indicating there is no asbestos in the drywall. A hard copy of the test results or report is required, must be less than 5 months old, and the description must match the drywall in question. For example, if the description on the test results or report indicates that a piece of drywall with blue paint was tested, the drywall being disposed of must visibly show blue paint.
- The drywall is confirmed to contain asbestos and has been double-bagged in the appropriate 0.15 mm or 6 mil poly hazardous waste bags (maximum bag size 38″ x 60″).
Asbestos
All customers will be required to fill out a Drywall/Asbestos Waste Declaration and Acknowledgement form.
Asbestos waste from contractors is also accepted – up to 20 bags per originating property per day, up to a maximum of 100 bags per originating property per calendar year
Common products that may contain asbestos include:
- Soffit boards, roof felting, under sheathing
- Fireplace box and mantel, artificial fireplace logs and ashes, fire doors, fire blankets
- Vinyl floor tiles/sheets and mastic
- Ceiling tiles
- Drywall mud, plaster, stucco, textured coatings
- Candescent light fixture backing (pot lights), heat reflectors
- Pipe (mechanical) insulation, furnace/boiler/hot water tank insulation
- Vermiculite (blown-in) insulation, spray-applied insulation (acoustic and fireproofing)
- Paper backing on fiberglass insulation, asbestos cardboard insulation